|
उत्पाद विवरण:
|
|
| उत्पत्ति के प्लेस: | शेनझेन, चीन |
|---|---|
| ब्रांड नाम: | Top-King |
| प्रमाणन: | ISO9001:2008;RoHS |
| मॉडल संख्या: | एचजे-1 |
|
भुगतान & नौवहन नियमों:
|
|
| न्यूनतम आदेश मात्रा: | 500 सेट |
| मूल्य: | विनिमय योग्य |
| पैकेजिंग विवरण: | 250 टुकड़े एक 300*250*152 मिमी दफ़्ती में एक साथ पैकिंग |
| प्रसव के समय: | पीओ और जमा के साथ 15 कार्य दिवस |
| भुगतान शर्तें: | प्रदान किया |
| आपूर्ति की क्षमता: | प्रति दिन 10000 टुकड़े |
|
विस्तार जानकारी |
|||
| सामग्री: | सीआरएस कोल्ड रोल्ड स्टील | रंग: | काला |
|---|---|---|---|
| व्यास: | 28 मिमी | मोटाई: | 23 मिमी |
| हेड कोड: | गोल | एचएस कोड: | 7307990000 |
| उपयोग: | लीन पाइप रैक सिस्टम को जोड़ना | सतह का उपचार: | वैद्युतकणसंचलन |
| प्रमुखता देना: | budget metal pipe joints,cost-effective pipe rack system,HJ-1 pipe joint system |
||
उत्पाद विवरण
When pipe rack systems need to deliver maximum value per dollar invested, the HJ-1 Metal Pipe Joint is the component that makes a cost-effective system possible without sacrificing structural reliability or reconfiguration capability. The HJ-1 uses CRS cold rolled steel -- an economical material choice that delivers strong mechanical performance without the premium cost of stainless steel or aluminum alternatives. The black electrophoresis coating adds functional value at an economical price point: unlike expensive stainless steel, the electrophoresis coating on carbon steel provides adequate corrosion resistance for most indoor warehouse and manufacturing environments at a fraction of the material cost. The bolt-and-nut assembly system means no welding equipment, no specialized assembly stations, and no certified welders required -- costs that add significant overhead to pipe rack projects built around welded systems. The reusable nature of the HJ-1 system also means the total cost of ownership over a 10-year period is typically lower than welded systems, because the initial investment is recovered when the system is reconfigured rather than discarded.
|
Parameter |
Specification |
|
Item Model |
HJ-1 |
|
Material |
CRS Cold Rolled Steel |
|
Color |
Black |
|
Surface Treatment |
Electrophoresis |
|
Thickness |
23 mm |
|
Combination |
HJ-1 = 2pcs H-1 + M6x25 bolt and nut set |
|
Installation |
Single M6 inner hexagon key for assembly |
|
Reusability |
Fully reusable -- pipes and joints can be disassembled and reconfigured |
|
Pipe Compatibility |
Suitable for standard pipe rack systems with 23mm pipe wall thickness |
|
Finish |
Electrophoresis coating -- wear-resisting, bright luster, pollution-free |
|
Structure |
Bolted and nut fastening -- easy assembly and disassembly without special tools |
|
Application |
Industrial storage, logistics equipment, workstation, production line, commercial display |
· CRS cold rolled steel at economical cost -- cold rolled steel provides the structural strength required for pipe rack applications at a significantly lower material cost than stainless steel or aluminum, without the quality trade-offs of hot rolled steel
· Electrophoresis coating for cost-effective corrosion protection -- electrophoretic coating on carbon steel provides adequate corrosion resistance for most indoor industrial environments at a fraction of the cost of stainless steel, with better corrosion resistance than paint or powder coating
· No welding equipment or certified labor required -- the bolted assembly system eliminates the significant capital and labor overhead associated with welded pipe rack fabrication, reducing total installed cost substantially
· Complete HJ-1 kit reduces procurement complexity -- each HJ-1 ships with the two H-1 joints and M6x25 hardware required for full assembly, eliminating the common problem of partial shipments that delay installation
· Lower total cost of ownership over system lifecycle -- the reusable bolted joint design means the investment is recovered at every reconfiguration rather than being written off as a permanent structure, delivering better ROI over 5 to 10 year planning horizons
Cost-sensitive warehouse storage racking, budget-conscious production line construction, contract manufacturer facility fit-outs, start-up manufacturing operation infrastructure, educational and training facility workshop installations, and any application where the total project budget is constrained but structural performance requirements remain non-negotiable. The reusable nature of the system is particularly valuable in start-up and early-stage manufacturing operations where the initial layout is likely to change significantly as the business scales, and where capital preservation across layout changes matters more than the lowest possible first-cost installation.
The cost effectiveness of the HJ-1 system is not simply a matter of low component price -- it is the result of a design philosophy that optimizes for total installed cost and lifecycle value rather than first-cost minimization. The CRS cold rolled steel material is chosen deliberately: it has the strength and machinability needed for the application without the material premium of higher-grade steels. The electrophoresis coating is applied electrostatically in a controlled bath, which is a highly efficient coating process that uses material very efficiently compared to spray or brush application methods -- this efficiency translates directly into a lower coating cost per part. The bolted assembly system is where the most significant cost savings are realized compared to welded alternatives: in a typical warehouse racking project, the welding equipment, certified welder labor, welding consumables, weld inspection, and post-weld finishing together can represent 30 to 40 percent of the total installed cost of the racking. The HJ-1 eliminates all of these costs by using mechanical fastening, which any trained worker can perform without specialized certification. The reusable bolted design then compounds this advantage over the system lifecycle: a welded rack that needs to be reconfigured after three years typically requires cutting and re-welding, at a cost comparable to the original fabrication. The HJ-1 system simply gets disassembled and rebuilt at the new configuration, at a labor cost roughly equivalent to the original assembly.
Combination:
one HJ-1 is combine with 2 pcs of H-1 ,and one set of M56*25 nut and screw
![]()
![]()
![]()
![]()
![]()
रेटिंग और समीक्षा
अपना संदेश दर्ज करें
कुल मिलाकर रेटिंग
रेटिंग स्नैपशॉट
निम्नलिखित सभी रेटिंग का वितरण हैसभी समीक्षाएँ